Finally the gears are truly starting to move for Boeing. In August the OEM had finally received the final FAA certification for its 737 MAX 7 aircraft. Little under 3 months later Boeing has now finally also received the final green light to its largest 737 variant, the MAX 10.
In this post:
- The Largest 737 MAX Ready To Enter Service
- Why Its Certification Is Of Vital Importance
- The Aircraft’s Specs
- Sign up to my newsletter
The Largest 737 MAX Ready To Enter Service
It’s been a long wait, a much longer one than anyone expected. Much longer than anyone forecasted in Boeing, no doubt about that. Nonetheless, finally the Boeing 737 MAX 10 has finally gotten the green light to enter service with airlines.
Finally after 2,000 hours of test flights and 1,000 hours of ground testing the FAA has cleared the Boeing 737 MAX 10 certifying it.
Certification of the Boeing 737 MAX 10, the largest of the MAX family, comes almost 3 months after certification of the smallest MAX the 7.

Why The Boeing 737 MAX 10 Certification Is Of Vital Importance
To put it in simple terms, Boeing was trying to go faster while having the handbrake engaged.
The manufacturer needs to increase deliveries and start working through its order book but it couldn’t until receiving certification for this variant of the 737 MAX.
The MAX 10 accounts for 1,555 orders in the 737 order book from 30 clients worldwide. That equates to roughly 30% of all orders for this aircraft type.
The ball could only start rolling and picking up momentum after the certification of the 737 MAX 10 and it being cleared to enter service.
Additionally the Boeing 737 MAX 10 is the most direct competitor to Airbus’ A321neo, as it has a similar seating capacity (but not the same range as the LR or XLRs). It not being available for service was clearly a huge handicap for Boeing even in its sales pitches.
We all knew it was a matter of weeks or days by now and so did airlines such as Lufthansa, which expanded its standing order just a month ago.
Now the next massive hurdle for Boeing is getting the Boeing 777X certified. That program has suffered just as long holdup and clients are expecting it to arrive in 2027 H1.
The Aircraft’s Specs
| Specs | 737-7 | 737-8 | 737-9 | 737-10 |
|---|---|---|---|---|
| Seats (two-class) | 135-160 | 160-180 | 175-195 | 185-210 |
| Maximum Seats | 172 | 210 | 220 | 230 |
| Maximum takeoff weight (Kg) | 80.280 | 82.640 | 88.310 | 89.760 |
| Range (KM) | 7.040 | 6.480 | 6.110 | 5.740 |
| Range (NM) | 3.800 | 3.500 | 3.300 | 3.100 |
| Length (m) | 35,6 | 39,5 | 42,1 | 43,8 |
| Wingspan (m) | 35,9 | 35,9 | 35,9 | 35,9 |
| Height (m) | 12,3 | 12,3 | 12,3 | 12,3 |
| Engine | LEAP-1B by CFM International | LEAP-1B by CFM International | LEAP-1B by CFM International | LEAP-1B by CFM International |

